https://portoflosangeles.org/getmedia/f94d8533-9846-4e79-965c-716c8367358e/Chapter_2_Project-Description
(to the north) and Mexico 26 (to the south). 27 Currently the out of water (landside) vessel repair capacity at the ALBS 28 accommodates five vessels through use of its four marine railways, one floating 29 dry dock, and dock space for dockside repairs
https://portoflosangeles.org/getmedia/127a0f03-7449-4ab4-abc4-a656f6db8183/Chapter_2_Project-Description
(to the north) and Mexico 26 (to the south). 27 Currently the out of water (landside) vessel repair capacity at the ALBS 28 accommodates five vessels through use of its four marine railways, one floating 29 dry dock, and dock space for dockside repairs
https://portoflosangeles.org/getmedia/65abc41c-77f6-44e5-9ae7-615a8682c2c2/Chapter_2_Project-Description
(to the north) and Mexico 26 (to the south). 27 Currently the out of water (landside) vessel repair capacity at the ALBS 28 accommodates five vessels through use of its four marine railways, one floating 29 dry dock, and dock space for dockside repairs
https://portoflosangeles.org/getmedia/fafa5381-099a-437b-93d9-f440e8e46323/Chapter_2_Project-Description_1
(to the north) and Mexico 26 (to the south). 27 Currently the out of water (landside) vessel repair capacity at the ALBS 28 accommodates five vessels through use of its four marine railways, one floating 29 dry dock, and dock space for dockside repairs
https://portoflosangeles.org/getmedia/23b4a736-a88d-4d10-a735-0ccbc0b8279b/Chapter1_Introduction
in the vessel 17 Chapter 1 Introduction Los Angeles Harbor Department December 2008 CH2M HILL 180121 1-18 Berth 97-109 Container Terminal Project Final EIS/EIR TB062008002SCO/Chapter1_LW2821.doc/081710007-CS speed reduction program, fuel
https://portoflosangeles.org/getmedia/3f99be64-736e-4432-b8e6-cc87673605aa/Item-3_CIP-Report_November-2023
Report: Totals New Work Orders Opened Since Last Report: The 2 project that is either over budget or at risk of being over budget include: 1) R. B. 197 Site Improvement project is under review and will need PDC action to adjust the schedule. (09/23) 3
https://portoflosangeles.org/getmedia/5d64798e-1bdc-4a59-ba87-162255fdd499/Item-3_CIP-Report
$40,000 Totals $10,157,745 2) Wilmington Waterfront Avalon Pedestrian Bridge project is under review and may need PDC action to adjust the schedule.(10/22) 3) Wilmington Waterfront Avalon Pedestrian Bridge DWP Marine Tank Farm Coordination project
https://portoflosangeles.org/getmedia/37a36722-67f2-4be4-bcaf-017a65a909be/Item-1_CIP_May-2022
to adjust schedule (9-21) The 3 projects that are either over budget or at risk of being over budget include: 1) The B. 218-220 Landside Stowage Pin Relocation project is under review and may need PDC action to adjust the budget (12-21). 2) State Route SR
https://portoflosangeles.org/getmedia/b4181a22-9a26-4ce7-9667-92e987558e88/_Response_to_Comments
mitigations beyond the vessel-strike reduction program is addressed in response to Comment 1-22. 1-7 Thank you for your comment. The general concer ns of USEPA regarding the use of the word maximize are noted. Please see the detailed response
https://portoflosangeles.org/getmedia/2bcc1f15-4d40-4f42-bb20-ef39b12c7f31/_Response_to_Comments
mitigations beyond the vessel-strike reduction program is addressed in response to Comment 1-22. 1-7 Thank you for your comment. The general concer ns of USEPA regarding the use of the word maximize are noted. Please see the detailed response