https://portoflosangeles.org/getmedia/e8422394-263f-4972-8944-666ede90ed0b/SEC03
charges will be assessed per gross registere d ton in addition to a charge assessed on the overall length of the vessel per movement type (see Item 300) according to the following tables: Gross Registered Ton (GRT) Rate Schedule Effective Date 4/1/2021
https://portoflosangeles.org/getmedia/c67d592a-00ef-49aa-992a-5cbc616fc895/04_Environmental_TAP-OGV-Retrofit-MOU_TRANSMITTAL-1
Exhibit A Table A-1 Contractor Project Tasks, Contractor Expenses, and Estimated Schedule TASK RETROFIT TASK No. TECHNOLOGY TASK DESCRIPTION Agencies CONTRACTOR COMPLETION DATE 1 MSC Project Management $200,000 Up to $100,000 Oct-25 2 Project Plan
https://portoflosangeles.org/getmedia/10159fc6-5e03-4303-8a7f-e7ead680ff41/Item-3_Cargo-Mrk_Permanent-Passenger-Fees_Board-Report
to amend Port of Los Angeles (Port) Tariff No. 4 (Tariff No. 4), Section Six "Passenger Fees", Item 600, approving 1) a five- year rate schedule with an annual three percent rate increase; 2) an adjustment to the effective date of each annual increase
https://portoflosangeles.org/getmedia/b8d5677f-9b74-48f2-bc1b-b6ec6fb02ab6/Item-3_Environmental_CARB-4th-Amend-Pasha-Green-Omni-Terminal_Board-Report
a Air Resources Board (CARB) to update funding among tasks, revise the schedule of milestones, and extend the term of the Green Omni Terminal Project (Project) at Pasha Stevedoring & Terminals L.P. (Pasha) through December 29 , 2023 . The g rant
https://portoflosangeles.org/getmedia/ce2902bd-c61b-45dd-bef4-c390938c8047/Appendix_F_Single_Point_Mooring_Evaluation
wate r depth of 100 feet, to accommodate the design vessel draft and margin for vessel motion exposed to open ocean conditions. A 3000-foot radius ar ound the mooring for the ca tenary of the SPM and vessel length, such that the berthed tanker does
https://portoflosangeles.org/getmedia/37c85934-2c33-4703-a028-44f26b57c09d/Appendix_F_Single_Point_Mooring_Evaluation
wate r depth of 100 feet, to accommodate the design vessel draft and margin for vessel motion exposed to open ocean conditions. A 3000-foot radius ar ound the mooring for the ca tenary of the SPM and vessel length, such that the berthed tanker does
https://portoflosangeles.org/getmedia/2f6ca48f-5b99-4fa8-9759-332c52327be7/Item-3_Cargo-Mrk_Permanent-Passenger-Fees_Transmittal-2
FEES Item No. PASSENGER FEES Every vessel carrying passengers for compensation shall be liable for and pay, in addition to the othe r charges provided in this Tariff, the following passenger fees for each passenger embarking from or debarking
https://portoflosangeles.org/getmedia/4df3439e-b568-4d3e-8a21-8bbfa36adcc8/Item-2_Cargo-Mrk_Temporary-Passenger-Fees_Transmittal-2
Item No. PASSENGER FEES Every vessel carrying passengers for compensation shall be liable for and pay, in addition to the othe r charges provided in this Tariff, the following passenger fees for each passenger embarking from or debarking
https://portoflosangeles.org/getmedia/d967b530-ec29-4262-97e0-386d69d2d1d5/_2010_CAAP_PUBLIC_WORKSHOP
years ahead of schedule LNG on - road truck fueling station constructed and operational since early 2009 (HDV2) 5 Accomplishments (cont.) Technology Advancement Program (TAP) Established in March 2007 As of early - 2010, ports have funded $5.4
https://portoflosangeles.org/getmedia/a798f543-aacd-40db-8c9f-6120958a1599/Item-3_Port-Pilots_Tariff-No-4-Charges-For-Pilotage_Transmittal-3
length of the vessel per movement type (see Item 300) according to the following tables: Gross Registered Ton (GRT) Rate Schedule Effective Date 4/1/2021 1/1/2022 1/1/ 2023 1/1/2024 1/1/2025 $0.00665 $0.00703 $0.00742 $0.00783 $0.00827 Overall Length