https://portoflosangeles.org/getmedia/d3436b8d-0dbd-4c24-8c1a-653b8ea791c6/Final-RFP-2024-AQ-Monitoring
and a seamless transition from the expired contract to the new contract, the following proposal submittal and review schedule is proposed: Request for Proposals Published Thursday, June 20, 2024 Questions Due Tuesd ay, July 9 , 2024 by 3pm Responses
https://portoflosangeles.org/getmedia/142550f1-b434-43f7-90f2-e46193e9872a/Audit-Committee-July-25,-2024-WEB
$200,000 $1,772,164 $50,000 $97,478 Harbor Administration Building Board Hearing Room and Executive Session Room Remodel is behind schedule and will need PDC action to adjust the schedule. B. 68 Port Pilots Living Quarters Buildings is under review
https://portoflosangeles.org/getmedia/40cc86bd-4342-47bb-abd7-4470a3fc9c1d/USACE-Notice
: Berths 212- 213, Berths 214- 216, and Berths 217- 220. The Berth 217 - 220 area is not currently operating but the other two are. In a ddition no vessel berthing or container movement operations occur dock side between Berths 221 - 224. The YTI
https://portoflosangeles.org/getmedia/3320a016-1162-4cf6-a45e-578407f4f15f/USACE-Notice
: Berths 212- 213, Berths 214- 216, and Berths 217- 220. The Berth 217 - 220 area is not currently operating but the other two are. In a ddition no vessel berthing or container movement operations occur dock side between Berths 221 - 224. The YTI
https://portoflosangeles.org/getmedia/d09ac824-81a1-4e67-8b55-d9ba3d1c4d07/FEIR_Chapter_1_Intro
, Clean Air Action Plan, and the Port of Los Angeles Real Estate Leasing Policy (LAHD 2006; Section 1.3), and would include emissions standards for terminal equipment; vessel speed reduction and fuel requirements; AMP for a proportion of marine
https://portoflosangeles.org/getmedia/2fc2e105-e54d-48a3-b07f-ae67f6642cbd/FEIR_Chapter_1_Intro
, Clean Air Action Plan, and the Port of Los Angeles Real Estate Leasing Policy (LAHD 2006; Section 1.3), and would include emissions standards for terminal equipment; vessel speed reduction and fuel requirements; AMP for a proportion of marine
https://portoflosangeles.org/getmedia/0222fe7a-0120-46a1-b01c-07635aafb903/00_Shell-MOTEMS_DEIR_Executive-Summary_March2018
for the proposed Project consists of a throughput of approximately 16 13.25 million barrels and 86 annual vessel calls , and the Project site includes the Shell 17 M arine O il T erminal at Berths 167 - 169 on Mormon Island. This facility encompasses a 18 land area
https://portoflosangeles.org/getmedia/0d98a547-6fac-42bc-a4e7-488d0c491602/00_Shell-MOTEMS_DEIR_Executive-Summary_March2018
for the proposed Project consists of a throughput of approximately 16 13.25 million barrels and 86 annual vessel calls , and the Project site includes the Shell 17 M arine O il T erminal at Berths 167 - 169 on Mormon Island. This facility encompasses a 18 land area
https://portoflosangeles.org/getmedia/0cceb901-ae58-4253-8d81-d211f374f56f/Chapter2_final
lighting, a new storm drain system and other upgrades. The constructi on would begin in 2012 and would occur over a three year period. The business would continue to operate during the proposed construction schedule. Permitting Based on the lead
https://portoflosangeles.org/getmedia/d3522789-c7ab-458c-bc7e-a639123cb079/Chapter2_final
lighting, a new storm drain system and other upgrades. The constructi on would begin in 2012 and would occur over a three year period. The business would continue to operate during the proposed construction schedule. Permitting Based on the lead