https://portoflosangeles.org/getmedia/17f5899f-fad7-4b60-b104-053d27f1858e/110714_Item5_Transmittal2
for several reasons, primarily related to projected increases in the size of vessels in the fleet mix throughout the life of the proposed Project. Forecasts show that vessel fleets calling at th e YTI Terminal will include larger vessels (up to 13,000 TEUs
https://portoflosangeles.org/getmedia/94a2e2a7-215a-4fad-9892-8be8fee33be3/YTI_Findings(Draft)_101014_Final
for several reasons, primarily related to projected increases in the size of vessels in the fleet mix throughout the life of the proposed Project. Forecasts show that vessel fleets calling at th e YTI Terminal will include larger vessels (up to 13,000 TEUs
https://portoflosangeles.org/getmedia/8f2475f5-8dcc-4fb7-aa8c-8f988d64793d/YTI_Findings(Draft)_101014_Final_1
for several reasons, primarily related to projected increases in the size of vessels in the fleet mix throughout the life of the proposed Project. Forecasts show that vessel fleets calling at th e YTI Terminal will include larger vessels (up to 13,000 TEUs
https://portoflosangeles.org/getmedia/ca2a81ad-2bea-474e-8e01-1bd88a4827e1/YTI_Findings(Draft)_101014_Final
for several reasons, primarily related to projected increases in the size of vessels in the fleet mix throughout the life of the proposed Project. Forecasts show that vessel fleets calling at th e YTI Terminal will include larger vessels (up to 13,000 TEUs
https://portoflosangeles.org/getmedia/a24d8089-943a-4c00-b81d-2d7884941b71/F-1197-(90306)-Chargers-022324
the Ethics Commission at (213) 978-196\0. Original Filing Amendment: Date of Signed Original ________________. Date of Last Amendment _________________. Schedule Summary Please complete all three of the following: 1.SCHEDULE A \227 Bidder's
https://portoflosangeles.org/getmedia/f6de6ffe-fe5f-40f1-9d09-0cdac162c0b8/05_ENG_TCEP_Presentation
Maritime Support Facility Maritime Support Facility Access/Terminal Island Rail System Grade SeparationMaritime Support Facility Access/Terminal Island Rail System Grade Separation Schedule Environmental Complete: December 2023 Design Complete
https://portoflosangeles.org/getmedia/fe480c05-fafa-49c9-82f7-ad6a1d63e724/3_CIP-Report_January-2024
Replacement 4) FY 24/25 CIP Deferred Maintenance Projects Totals Harbor Administration Building HVAC Replacement project is under review and may need PDC action to adjust the schedule. B. 155A Re Roof and Drain Installation project is under review and may need
https://portoflosangeles.org/getmedia/fa2e29a1-89ab-4d35-b487-2178b4efe6f9/04_EMD_CEC-Subrecipient-Amend-3_Transmittal-1
Exhibit A Attachment A-1 Task Number Task Name Product(s) Due Date 1 1.1 Updated Schedule of Products 6/15/2017 Updated List of Match Funds 6/15/2017 Updated List of Permits 6/15/2017 Kick-Off Meeting Agenda (CEC) 6/15/2017 1.2 CPR Report 10/31/2018
https://portoflosangeles.org/getmedia/1173ca3c-8043-4837-a1dd-0e31ccb98217/09-05-2019_Regular_Agenda_Item_6_Transmittal_1
personnelwill participate in an initial Project Kick- Off meeting with CARB staff before work on the project begins. The purpose of the initial meeting will be to discuss the overall plan, details for performing the tasks, the project schedule, and any
https://portoflosangeles.org/getmedia/c152f487-1652-4ca8-90d1-10888121e904/Orcem-Chap-4-Cumulative-Analysis-DEIR
( E cocem ) Low - Carbon Cement Processing Facility ( Proposed Project ) Construct ion and operation of a dry bulk terminal for vessel unloading, raw material milling, and storage and loading onto trucks of low - carbon construction binder . Notice