https://portoflosangeles.org/getmedia/64b327f8-5bf3-4734-b240-22e76c33835b/FEIR_Executive_Summary
or underutilized industrial la nds adjacent to the existing terminal. In 2003, the existing terminal handled 891, 976 20-foot equivalent units (TEUs) of containerized cargo, and had 246 vessel calls. At full operation, expected to occur by 2025
https://portoflosangeles.org/getmedia/474c9b2e-b6d6-430a-9118-042b066c53d9/Item-7_Environmental_NuStar-Valero-IS-MND_Transmittal-1
terminal s (Berths 163 and 164) by combining vessel operatio ns at the two existing wharfs into a single new wharf structure to be located at Berth 163 and decommissioning Berth 164 as a marine oil transfer facility. It also includes the consideration
https://portoflosangeles.org/getmedia/86dea521-af19-4b47-be48-e2ded5912bfc/Final-IS-MND-NuStar-Valero
terminal s (Berths 163 and 164) by combining vessel operatio ns at the two existing wharfs into a single new wharf structure to be located at Berth 163 and decommissioning Berth 164 as a marine oil transfer facility. It also includes the consideration
https://portoflosangeles.org/getmedia/2ee69755-0131-4f40-95e8-67c576ca1646/Item-3a_CIP_Final-Audit-Committee-Report_1-27-22
$144,569 9% 2 3. B. 176-179 - Electrical Infrastructure Improvements (2544100) Construction 08/31/20 100% 11/30/23 1% 6 $7,754,000 $793,226 10% 3 January PDC--Budget and schedule change. 5. B. 178 - Office Building Re-Roof (2565000) Completed N
https://portoflosangeles.org/getmedia/fbbaa2ea-2cba-4f8a-aea3-6f59c6f7a542/SA-Recycling-Findings-of-Fact
and recycling capacity consistent with applicable local and state regulatory requirements. Utilize an existing permitted metal recycling site to continue providing economical, efficient and safe metal recycling and bulk export by vessel
https://portoflosangeles.org/getmedia/b51c5960-2960-4364-9eb9-7cdd0c9107f0/04112024-06-Environmental-Board-Transmittal-2
and recycling capacity consistent with applicable local and state regulatory requirements. Utilize an existing permitted metal recycling site to continue providing economical, efficient and safe metal recycling and bulk export by vessel
https://portoflosangeles.org/getmedia/0cb0dfd9-8dbb-4740-bb71-d2061f185498/Regular-Meeting-Board-Book-August-22,-2024-Website
LOS ANGELES BOARD OF HARBOR COMMISSIONERS Harbor Administration Building 425 S. Palos Verdes Street San Pedro, California 90731 REGULAR MEETING AGENDA THURSDAY , AUGUST 22 , 2024 AT 1 0 :00 AM Board of Harbor Commissioners Lucille Roybal ...
https://portoflosangeles.org/references/2024-news-releases/news_062824_vespucci
sailing ship and training vessel of the Italian Navy, the Amerigo Vespucci will be docked at Berth 46 in the Port’s Outer Harbor. Tour reservations are required and can be made at https://tourvespucci.it/en/events/come-aboard/. Next to the vessel
https://portoflosangeles.org/getmedia/3a7dd45a-6902-44ea-9206-8f258a9e2dca/FINAL-QA-Emission-Control_5-15-24
DATE: May 16, 2024 SUBJECT: REQUEST FOR PROPOSALS FOR ON - CALL OCEAN - GOING VESSEL AT BERTH EMISSIONS CONTROL SERVICES Pursuant to the On - Call Ocean - Going Vessel At Berth Emissions Control Services Request for Proposals (RFP), all proposers
https://portoflosangeles.org/references/news_072319_port_police_marijuana_seizure
attempting to exit the public boat launch at Cabrillo Beach. Numerous vehicle and vessel violations led to a search of the vessel, which yielded nearly 1,200 pounds of seized marijuana. Three men were detained and subsequently taken into custody