https://portoflosangeles.org/getmedia/e908f994-995c-4e5d-850a-4baa00d309cb/NOP_Final
with regulatory requirements, and to improve its ability to build and repair ships and vessels. Improvements would include maintenance dredging to ensure adequate vessel access to the site, beneficially reusing dredged material by constructing two confined
https://portoflosangeles.org/getmedia/8165f132-0985-47d8-869d-b07ba24bb1d1/NOP_Final
with regulatory requirements, and to improve its ability to build and repair ships and vessels. Improvements would include maintenance dredging to ensure adequate vessel access to the site, beneficially reusing dredged material by constructing two confined
https://portoflosangeles.org/getmedia/1f4f7dcf-1c2b-42d1-b857-e64e2958a3a8/06_Information-Technology_CIG-Grant-Agreement-No-3_Transmittal-3
supply chain r elated values will be added to the emission calculator. This could include ocean vessel voyages, on- terminal motor moves, a nd dock ed vessel power consumption. POLA will utilize the Emission Baseline and Asset Green Scores to evaluate
https://portoflosangeles.org/getmedia/e6bc5d54-8150-437b-aa0e-3bfea424798e/Adopted-Annual-Budget-FY-2023-2024
schedule around back-to-school and the fall/winter holidays. During FY 2022/23, the Port continued its focus on several ongoing priorities, including supply chain innovation and infrastructure. Highlights include being awarded a $20.0 million federal RAISE
https://portoflosangeles.org/getmedia/7f028ab7-ee91-455f-8c61-98798e9c809d/Item-3_FP-A_Adoption-of-Proposed-FY-2023-24-Annual-Budget_Board-Report_Transmittal-1
in the first quarter of FY 2023/24 as retailers restock and cargo flows retu rn to a more traditional peak-season schedule around back-to-school and the fall/winter holidays. During FY 2022/23, the Port continued its focus on several ongoing
https://portoflosangeles.org/getmedia/648f83d8-076c-4b13-9f32-d9cd82228eb5/B1_CS_Appendix_B1_Air_Emissions_DSEIR
on Replacement Schedule for CHE Figure B1-A. China Shipping Truck Trips Time -of-Day Distribution for Baseline and Future Cargo Handling Equipment (CHE) Table B1-1. 2014 FEIR Mitigated Scenario CHE Equipment List Table B1-2. 2014 FEIR Mitigated Scenario CHE
https://portoflosangeles.org/getmedia/d84f6919-26a0-49cc-b2a5-3b0d9c1ff894/B1_CS_Appendix_B1_Air_Emissions_DSEIR
on Replacement Schedule for CHE Figure B1-A. China Shipping Truck Trips Time -of-Day Distribution for Baseline and Future Cargo Handling Equipment (CHE) Table B1-1. 2014 FEIR Mitigated Scenario CHE Equipment List Table B1-2. 2014 FEIR Mitigated Scenario CHE
https://portoflosangeles.org/commission/agenda-archive-and-videos/020515-regular-agenda
and the Board Secretary to attest to the proposed Revocable Permit; and (3) adopt Resolution No.____________. Construction and Maintenance 5. Re: RESOLUTION NO. ____________ - PROPOSED SALE OF MARINE VESSEL ANGELENA II SUMMARY: In September 1988, the City
https://portoflosangeles.org/getmedia/1ef2dec3-f0f9-4e76-b333-883fa69a4ab8/081811_RegAgenda_Item_6_Transmittal_1
Department will be purchasing an approximately 65 foot catamaran vessel with federal grant funding. In accordance with Los Angeles City Charter \247375 and Los Angeles Administrative Code \24710.18, the City of Los Angeles is issuing bid specifications
https://portoflosangeles.org/getmedia/26fd5727-9583-4a64-bee2-91f7822700bf/081811_RegAgenda_Item_6_Transmittal_4
Department will be purchasing an approximately 65 foot catamaran vessel with federal grant funding. In accordance with Los Angeles City Charter \247375 and Los Angeles Administrative Code \24710.18, the City of Los Angeles is issuing bid specifications