Construction Specs
|
|
| Spec
No. |
Description |
Project
Manager |
Pre-Bid
Meeting Date/ Time |
Pre-Bid Meeting Room No. |
Deadline
(Bid Opening Date) |
Bid
Room No. |
Engineer's
Estimate |
2681
Addendum 1
|
Berths 219-225 Dike and Bulkhead Improvements
Project Description: Excavating fill material behind existing bulkhead wall, filling the remainder with salvaged quarry rock, compacted soil, capping the repair with asphalt concrete. |
Genevieve Fernandez (310) 732-7690 |
Date Passed |
Date Passed |
08/21/08
2:45 p.m. |
3rd Floor |
$3,500,00- $4,300,000 |
2712*
Addendum 1
|
Cabrillo Way Marina
Project Description: construct a new marina, including dredging & fill, piling, floating docks, grading & paving, and landscaping.
|
Bob Zmuda
(310) 732-3631 |
Date Passed |
Date Passed |
08/28/08
2:45 p.m. |
3rd Floor |
$115,000,000-
$135,000,000 |
2699
|
Harry Bridges Boulevard Buffer
Project Description: develop approximately 30 acres of land in the Wilmington area. Work includes demolition of pavement, fencing, substructures and other site improvements, construction of bridges, retaining walls, and buildings. |
Scott Gilmour
(310) 732-7635 |
08/26/08
9 a.m. |
2nd Floor Boardroom |
09/16/08
2:45 p.m |
3rd Floor |
$47,500,000-
$56,100,000 |
• To obtain plans and/or specifications not shown, call (310)732-3522.
• An asterisk(*) after the spec number indicates an addendum.
• Engineering and Construction Business Opportunities Outlook |
|
|